Chemistry kits
Every Kit has its own operating envelope.
A Chemistry Kit is a controlled process package: feed acceptance, chemistry, recipe, hardware configuration, safety limits, cleaning logic, evidence and named output receivers. It must remain inside the outer Adapt platform envelope, but its released window is narrower and specific to the application.
Controlled Kit register
Purpose, envelope focus and maturity shown together.
The register includes core, specialty, environmental and future packages. A family name is not permission to run: the case-specific envelope values and evidence must be released for the named feed and project.
| Kit | Chemistry / domain | Primary duty | Published source-based screening bounds | What the full Kit envelope must define | Status / rule |
|---|---|---|---|---|---|
| KIT-A | Aqueous Chloride / Nitrate | Base metals, REE and chloride/nitrate hydrometallurgical duties | pH 1.0–2.5 · 35–80 °C · chloride 0.5–5 wt% (>2 wt% requires review) · solids 5–15 wt% · ORP TBV | Feed assay and mineralogy · materials · reaction and recovery duty | Core kit · project qualification |
| KIT-B | Organic Acid | Mild acidic leaching, selective dissolution and lower-hazard acid systems | pH 1.5–4.0 · 60–80 °C · organic acid 0.5–1.5 M · H₂O₂ 0–2 vol% · solids 2–10 wt% | Acid identity · materials · gas/heat/foam · separation and residual route | Core kit · project qualification |
| KIT-C | DES / High Viscosity | Deep eutectic solvent and high-viscosity solvometallurgy | Recipe-defined; aqueous pH not applicable · 25–70 °C screening range · 70–80 °C TBV · viscosity 1–150 mPa·s; 150–400 mPa·s only with the qualified high-viscosity pack | Mixing and heat duty · seals/materials · transfer and phase separation | Core kit · viscosity pack may be required |
| KIT-D | Sulfate / Acidic REE | REE-rich tailings and acidic sulfate duties | Atmospheric sulfate only · pH 0.5–2.0 · 20–80 °C · H₂SO₄ 0.5–3 M TBV · solids 5–15 wt% | Mineralogy · corrosion and gas basis · reaction/selectivity · recovery and residue | Controlled acid kit |
| KIT-E | AquaClean | Water treatment and metal-bearing effluent conditioning | Preliminary: pH 5.5–9.0 · 15–60 °C · solids <1 wt% · conductivity 0.5–50 mS/cm | Complete water matrix · selected barriers · emissions/residuals · named receiver | Environmental kit · case qualification |
| KIT-H | Catalyst Recovery | Spent catalyst and strategic-metal recovery | HCl/H₂O₂ route · pH <1 · 25–80 °C · pulp 2–5 wt% · example screening basis 10% HCl + 1% H₂O₂; final recipe TBV | Catalyst identity · hazardous constituents · product and managed residual route | Specialty recovery kit |
| KIT-I | AquaSafe | Water polishing, safety conditioning and compliance support | pH 6–9 · 15–40 °C · suspended solids <0.1 wt% · conductivity 0.5–50 mS/cm · BDD only after matrix testing | Complete analysis · selected polishing duty · product-water and off-spec receivers | Environmental kit · case qualification |
| KIT-J | Textile Effluent | Textile wastewater, dyes and process-effluent conditioning | pH 5–9 · 15–60 °C · TSS <1 wt% · conductivity 0.5–50 mS/cm · current density and contact duty TBV | Dye/chemical matrix · COD/TOC · barrier duty · residual and receiver criteria | Environmental / process kit |
| KIT-K | Lithium / DLE Interface | Chemistry and cartridge-interface qualification around lithium-bearing brines; not a DLEM technology release | Named cartridge required · pH 6.5–8.5 for neutral routes · 15–80 °C (>40 °C requires review) · zero solids after filtration · chloride/TDS TBV | Lithium and competing ions · cartridge limits · product and raffinate receivers | Special interface kit · partner qualification |
| KIT-L | Polymer Depolymerization | Polymer and plastics process-development interfaces | Current Adapt screening is limited to exploratory conditioning at 15–80 °C. PET glycolysis at 110–270 °C and 1–25 atm is outside the released platform basis. | Polymer/feed identity · solvent and heat duty · materials · emissions and residues | R&D / future kit |
| KIT-M | Carbon Mineralization | Alkaline mineralisation and CO₂-binding routes | pH 7–10 · 15–80 °C · atmospheric/low pressure only · solids 5–15 wt% TBV · high-pressure CO₂ excluded | Mineral alkalinity · gas/source specification · mass transfer · product stability | Future / flexible kit |
| KIT-N | Textile Dissolution | Textile dissolution and material-separation chemistry | No source-backed Kit-specific window released · outer platform screening at 15–80 °C only · viscosity must be measured; 150–400 mPa·s requires the qualified pack | Fibre blend · chemistry/selectivity · phase separation · product and residual route | Source gap · project evidence required |
| KIT-O | Tailings Stabilization | Tailings conditioning, stabilisation and residual-risk reduction | pH 8–10 · 15–60 °C · solids 10–20 wt% (15 wt% default) · ANC/ABA and leach-proof evidence required | Tailings variability · geochemistry · water balance · long-term receiver criteria | Mining / residue kit |
| PFAS | PFAS Destruction Kit | Separated PFAS development track | No source-backed operating window or destruction-performance release · segregated HOLD track | Full PFAS/water matrix · selected technology · emissions/by-products · residual verification | Excluded from standard Kit release |
| BIO-S | Bio-Sulfide Kit | Separated biological/sulfide development track | No source-backed operating window or biological-process release · segregated HOLD track | Biology and sulfide basis · gas/exposure controls · cleaning and deactivation | Excluded from standard Kit release |
How kits work
Hardware + recipe + evidence.
A kit is a controlled configuration package. The chemistry cannot bypass the physical or digital envelope of the selected product.
Controlled change
The kit can change. The permission model does not.
| Kit element | What it contains | Release requirement |
|---|---|---|
| Chemistry definition | Reagents, concentrations, order and limits | Representative process validation |
| Hardware configuration | Wetted materials, dosing, heat, mixing and separation | Compatibility and duty evidence |
| Control recipe | Setpoints, sequences, alarms and forbidden transitions | SRS / cause-and-effect review |
| Cleaning / changeover | CIP, flush, contamination and waste route | Verified end state and receiver |
| Product route | Named quality criteria and downstream receiver | Product verification and receiver acceptance protocol |
Your chemistry · your process knowledge
Customers and technology partners can develop their own Kit.
A proprietary formula can be submitted as a controlled customer or partner Kit. Elemenos qualifies whether and how it can operate inside the platform architecture; the formula does not need to be published on this website or exposed to other operators.
| Step | What happens | What the customer receives |
|---|---|---|
| 1 · Define | Submit the feed, process objective, formula boundary and available evidence under the agreed confidentiality framework. | A scoped qualification plan and explicit data gaps |
| 2 · Qualify | Review platform-envelope compatibility, materials, hazards, process duty, recipe limits, outputs and residual routes. | A Kit-specific operating envelope or a documented no-go |
| 3 · Validate | Run representative laboratory, treatability or pilot work at the evidence level required for the duty. | Traceable evidence tied to the named feed and recipe version |
| 4 · Release | Freeze the permitted recipe, hardware pack, control sequence, access rules and changeover method. | A controlled customer or partner Kit for the agreed project scope |